Requirements vary by jurisdiction and change over time. Build the process around verification.
01Confirm with the building department
State and local rules for accessory dwellings evolve. Treat any summary, including this one, as a starting point for a conversation with the local agency.
02Site constraints first
Setbacks, utilities, access, and existing structures often decide feasibility before design preferences do.
03Align design and budget early
Small projects still have sequential dependencies. Early pricing helps the design team stay inside what the owner intends to spend.
General editorial guidance. It is not legal, engineering, or project-specific advice, and it does not describe any particular Pinnacle project.